1. Use a chalk line, gauge, laser level, or other means to be certain the run is straight, marking locations for
brackets.
2.
Border/perimeter of sign cabinets should always have orientation of Street Fighter Wrap™ housing raised
lip outboard on vertical or diagonal. Orient brackets so that the drain holes will be on the bottom side of
the horizontal runs.
3.
Install mounting brackets. Spacing will be no greater than 17.75". Length for Standard, Mix-n-Match and
Specialty Street Wrap™ is 106.5", RGB is 104". Use pre-drilled wire hole mounting brackets at transformer
locations.
Note: Track sections share a bracket at the ends to keep ends together and straight. There must be a space left between 106.5" plastic track sections (NOT LEDs) of 3/16".