During Operation - Atlas Copco GA 37 VSD Instruction Book

Hide thumbs Also See for GA 37 VSD:
Table of Contents

Advertisement

Procedure
1. Open the air outlet valve.
2. Switch on the voltage. Check that voltage on LED lights up.
3. Press the start button on the control panel. The compressor starts running and the automatic
operation LED lights up. Ten seconds after starting, the drive motor switches over from star
to delta and the compressor starts running loaded.
6.4

During operation

Warnings
Checking the oil level
88
Control panel Elektronikon™ Graphic
The operator must apply all relevant
solving.
Keep the doors closed during operation. They may be opened for short periods only to
carry out checks.
When the motors are stopped and LED (automatic operation) is alight, the motors may
start automatically.
Control panel Elektronikon™ Graphic
Safety
precautions. Also consult section
Instruction book
Problem
API480496

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GA 37 VSD and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Ga 45 vsd

Table of Contents

Save PDF