Download Print this page

Technibel KPSW 2 Installation Instructions Manual page 14

Floor or ceiling type terminal units

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 12
3.2 - FLoor InstaLLatIon
F
a
GB
I
E
Find the place for the installation. The unit can be
D
connected in four different directions: at the right-back
side, at the left-back side, at the bottom on the right or
on the left.
c
Make a Ø 80mm hole, as required.
E
Open a pre-punched hole for the
pipe passage (work from outside).
Fit the seal delivered with the device around the
edge of the hole used for the cable feed-through
(cable protection).
G
the electrical and hydraulic connections
according to the indications given in paragraph 4.
3.3 - waLL InstaLLatIon
a
The unit can be connected in four different directions:
- at the right-back side, at the left-back side,
- at the bottom on the right or on the left.
4
5 / 10 mm
Carry out
B
Bend the fullscale diagram, level it and mark the holes to
drill (pipes, condensate drain pipe, brackets).
D
Remove the return air grille releasing it from the side guides
and the central elastic stop.
F
Fix the bracket, hook the unit and place it against the wall.
H
Fix both the side panels and
reassemble the return air
grille.
B
Place the fullscale diagram, level it and mark the holes to
drill (pipes and brackets).
plug

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Kpsw 4Kpsw 3