La'' Aluminium Boom - Hardi EVRARD ALPHA 2500 Operating And Maintenance Manual

Hide thumbs Also See for EVRARD ALPHA 2500:
Table of Contents

Advertisement

A L P H A 2 5 0 0
2-

''LA'' ALUMINIUM BOOM

10-3
9
4
UNFOLDING
Please carry out following procedure :
- Operate the switch (9) to lift the boom clear of the rear
transport brackets. Ensure that the booms are clear from
the transport brackets before unfolding is commenced
- Operate the switches (11 and 13) to open inner sections
- Operate the switch (14) to open outer sections. - standard
- Operate switch (6) to lower the boom and adjust above
the crop or ground level
- Operate the switch to unlock the boom (12)
- Operate the switch (4 or 7) to slope the boom.
(*) Individual outer boom sections folding as option:
The locking of the boom is used to unfold one outer section at a time, for this purpose :
- Operate the switch (12) to lock the boo
- Operate the switch to close the LEFT outer section (10) or to close the RIGHT outer section (14)
!
The locking must be only used when a obstacle is close to the boom (post, road, etc. ...).
677824
2- 18
CHAPTER
01/02
4 7
10
11
10
7
6
(10 and 14) - option (*)
12
13
11
The folding functions must only be operated
!
when sprayer is stationary on a flat area
Please carry out following procedure :
- Operate the switch (4 or 7) to control the boom horizontally
- Operate the switch (9) to lift the boom to upper position
- Operate the switch (12) to lock the boom.
- Operate the switch (14) or (10 -14) to close the outer sections
- Operate the switch (11 and 13) to close inner sections
- Operate the switch (9) to lower the boom until boom rests
on rear transports brackets.
D E S C R I P T I O N A N D U S E
9
6
14
12
13
FOLDING
14
.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents