Battery Connection:
1. The 120VAC TotalArc model has a din rail
mounted battery pack that is pre-wired at
the factory.
2. Locate the battery pack inside the
enclosure
3. Locate fuse hanging off the battery pack
case in a plastic bag
4. Insert blade fuse.
◼ 12-24VDC Power TotalArc (p/n 460348):
12-24VDC Power Wiring:
1. Run conduit connection into plugged Myers
Hub on bottom of enclosure panel
***WARNING: PROPER HAZARDOUS
LOCATION WIRING METHODS MUST
BE USED WHEN INSTALLING AND
TERMINATING THE TOTALARC BMS***
2. Insert enough length of wire to reach the
terminal blocks.
3. Terminate wires to terminal blocks:
+24 VDC wire to Terminal Block V+
-24 VDC wire to Terminal Block V-
Green wire to Terninal Block G
TROUBLE RELAY CONNECTIONS
The TotalArc BMS includes a set of contacts for
remote trouble reporting for Customers.
Heater Trouble Customer Connections:
TB19 and TB20
"1" = OKAY
"0" = TROUBLE
For details on Dry Contact Ratings please see
label inside of TotalArc Enclosure
IGNITION ROD INSTALLATION
This product requires assembly.
◼ Ignition rod must be installed towards the top of
the pilot assembly with the hook oriented
downwards into the pilot nozzle.
◼ Before setting the ignition rod's final position –
check the spark gap. A standard spark gap is
between 1/8" and 3/16" – anything smaller
might not ignite a flame, anything larger might
not create a spark. See Figure 6 (pg V) for
details.
ASSEMBLY
◼ The ignition rod's position can be adjusted by
using a 7/64" allen wrench and loosening a set
screw on the rod's clamp. Once the position is
set, tighten the set screw.
◼ Ground connection – remove one side of the
metal clamp holding the ceramic insulator and
install provided #12AWG THHN green ground
wire with terminal connector and replace screw.
Install opposite end of ground wire to the ground
lug on the ignition module – remove the wing nut
and re-install with ground wire.
SOLAR PANEL
This product requires assembly. See Figures 8, pg
VI and Figure 9, pg VII.
1. Install 2" pipe cap to top of solar mounting
2. Install 2" solar mounting pole on heater
3. Install solar panel to solar mounting pole
4. Loosen solar panel angel adjustment bolts
5. Loosen the heater mounting u-bolt and
6. Install SO-Cord from solar panel through
7. Terminate solar panel power leads as
8. Confirm panel fuses are installed by
9. Place battery in bottom of battery enclosure.
10. Terminate battery as shown in Figure 5.
11. Ensure heater is properly grounded.
12. Ensure TotalArc cable assembly is properly
13. Install Clamshell lock out device around
7
pole.
support base and secure with u-bolt and
hardware to upper support on side of
heater.
with (2) u-bolts and hardware so that the
bottom of the solar panel is about 7 feet
from grade (see Figure 8, pg. VI).
to adjust angel of solar panel from vertical
based on the table in Figure 9, pg. VII.
rotate the solar panel to due-South to
capture the maximum sunlight
cord grip located in the bottom of the
TotalArc battery enclosure.
shown in previous "Solar Panel Wiring"
section. Area must be nonhazardous during
installation.
opening each fuse holder, inspecting the
fuse, and reinstalling. FU1 should be 4A,
FU2 should be 4A, FU3 should be 1A.
secured at both the TotalArc and Ignition
Module
connectors as shown in Figure 4.