Si39-504
3.
Special Control
3.1
Startup Control
This control is used to equalize the pressure in the front and back of the compressor prior to the startup of the
compressor, thus reducing startup loads. Furthermore, the inverter is turned ON to charge the capacitor.
In addition, to avoid stresses to the compressor due to oil return or else after the startup, the following control is made
and the position of the four way valve is also determined.
3.1.1 Startup Control in Cooling Operation
Compressor
Outdoor unit fan
Four way valve
Main motorized valve (EV1)
Subcooling motorized valve
(EV2)
Hot gas bypass valve
(SVP)
Receiver gas discharging
valve (SVG)
Non-operating unit liquid
pipe stop valve (SVSL)
Ending conditions
3.1.2 Startup Control in Heating Operation
Compressor
Outdoor unit fan
Four way valve
Main motorized valve (EV1)
Subcooling motorized valve
(EV2)
Hot gas bypass valve
(SVP)
Receiver gas discharging
valve (SVG)
Non-operating unit liquid
pipe stop valve (SVSL)
Ending conditions
Function
Thermostat ON
Pressure equalization
control prior to startup
OFF
OFF
OFF
0 pls
0 pls
ON (RXYQ5MA model)
OFF (RXYQ8 ~ 16MA models)
OFF
ON
RXYQ5MA model
• Pc - Pe<0.20MPa
OR
•
• A lapse of three
minutes
RXYQ8 ~ 16MA models
• A lapse of 15 sec.
Thermostat ON
Pressure equalization
control prior to startup
OFF
STEP4
ON
0 pls
0 pls
ON (RXYQ5MA model)
OFF (RXYQ8 ~ 16MA models)
OFF
ON
RXYQ5MA model
• Pc - Pe<0.20MPa
OR
• A lapse of three
•
minutes
RXYQ8 ~ 16MA models
• A lapse of 15 sec.
Startup control
STEP1
52Hz
+2 steps/20 sec.
+OFF +OFF
(until Pc - Pe>0.39MPa is achieved)
+1 step/15 sec. (when Pc>2.16MPa)
OFF
-1 step/15 sec. (when Pc<1.77MPa)
OFF
OFF
2000 pls
2000 pls
0 pls
0 pls
ON
ON
OFF
OFF
ON
ON
OR
A lapse of 5 sec.
Startup control
STEP1
52Hz
+2 steps/20 sec.
+OFF +OFF
(until Pc - Pe>0.39MPa is achieved)
OFF
STEP8
ON
ON
0 pls
0 pls or 180 pls
0 pls
0 pls
ON
ON
OFF
OFF
ON
ON
OR
A lapse of 5 sec.
Special Control
STEP2
• A lapse of 320 sec.
• Pc - Pe>0.39MPa
STEP2
• A lapse of 130 sec.
• Pc>2.94MPa
77