Optional Electric Heat - Lennox CBX25UHV Series Installation And Service Procedure

Table of Contents

Advertisement

2. Set the meter to the lowest ohms scale.
If the readings are all less than 20 ohms and within +/­ 10%
of each other, the motor passes this test. If not, the motor
has failed and must be replaced.
Figure 11. Testing Motor Windings (Winding to
Winding)
D-Coil
CBX25UHV units have dual slab coils arranged in an A
configuration. Each coil has two or three rows of copper
tubes fitted with ripple-edged aluminum fins. An expansion
valve, feeds multiple parallel circuits through the coils. The coil
is designed to easily slide out of the unit cabinet.
E-Drain Pans
Drain pans are provided and installed on the CBX25UHV.
Upflow Applications
NOTE - If the unit is installed in the upflow position, the
horizontal drain pan must be removed to ensure best air
flow and efficiency.
HORIZONTAL DRAIN PAN
IMPORTANT - REMOVE PAN
FOR BEST EFFICIENCY
AND AIR FLOW.
UPFLOW
DRAIN PAN
UPFLOW DRAIN
CONNECTIONS (BOTH
SIDES; USE ONE SIDE
OR OTHER)
Figure 12. Upflow Configuration
Horizontal Applications
NOTE - The unit is shipped with the horizontal drain pan
positioned for left-hand air discharge. The drain pan and
blow-off prevention bracket (-030 and larger units only)
must be removed and repositioned for use in right-hand air
discharge applications.
NOTE - When the unit is installed in horizontal applications,
a secondary drain pan is recommended. Refer to local
codes.
Units installed in a horizontal position must be sloped
slightly downward toward the drain connections to
ensure good drainage.
III-OPTIONAL ECB25 ELECTRIC HEAT
Optional
field-installed electric heat for air handler units.
Table 11 shows the available heat sections. Refer to the
Product Specifications for heat section applications.
Description
2.5 KW with stripped wires
5 KW with terminal block
5 KW with 30-amp circuit breaker
7.5 KW with terminal block
HORIZONTAL DRAIN
7.5 KW with 45-amp circuit breaker
CONNECTIONS
10 KW with terminal block
(BOTH SIDES; NOT
USED)
10 KW with 60-amp circuit breaker
12.5 KW with 25- and 50-amp circuit breakers
15 KW with 30- and 60-amp circuit breakers
20 KW with two (2) 60-amp circuit breakers
A-Heat Section Installation
Disconnect all power to the unit before servicing and
installing this equipment. Use proper tools and protective
equipment during installation and service.
Page 13
HORIZONTAL LEFT-HAND
AIR DISCHARGE
(FACTORY DEFAULT)
HORIZONTAL RIGHT-HAND
AIR DISCHARGE
NOTE - BLOW-OFF PREVENTION BRACKET. IS NOT REQUIRED ON 1.5-
AND 2-TON (-018 AND -024) UNITS.
Figure 13. Horizontal Left-Hand Air Discharge
ECB25
electric
Table 11. Electric Heat Sections
BLOW-OFF PREVENTION
BRACKET.
BLOW-OFF PREVENTION
BRACKET.(ROTATED AND
RE-SECURED)
heat
sections
provide
Catalog Number
89W42
89W43
89W44
89W45
89W46
10Z43
10T37
89W49
10T14
10T35

Advertisement

Table of Contents
loading

Table of Contents