RANGER
®
330MPX
CABLE STRAIN RELIEF INSTALLATION
Two strain relief assemblies are shipped with the Ranger to be
assembled by the customer. The parts are:
• ¼-20 T30 drive button head screws (Item A - Qty 4)
•
Vibration isolating clamps (Item B - Qty 2)
•
Stainless steel shackle (Item C - Qty 2)
FIGURE A.4 - STRAIN RELIEF INSTALLATION
A
WARNING
Do not pull or lift the Ranger by the strain relief shackles.
To install:
1) Obtain one isolator (Part of Item B) and one shackle (Item C). If
the cord has a large connector on the end, place the shackle
around the cord at this time. Thread the pin through the
shackle and the rubber part of the isolating clamp. It will be
much easier to do this step without the stainless steel strap
over the rubber isolator. Leave finger tight. Once installed,
the rubber will grab the pin and prevent it from rattling loose.
Repeat this step again for the other side of the machine.
2) Push a stainless steel strap (Part of Item B) over each rubber
isolator as pictured. It should fit snugly.
3) Using two ¼-20 T30 button head screws (Item A), mount one
assembly as shown to each side of the front of the Ranger
using the provided spacers (Item D). Tighten each T30 screw
to 50 in-lbs. For ease of operation, position each shackle so
that the shackle pin head is pointed towards the outside of
the machine, as pictured below.
4) Route leads and power cords through the shackles as shown
in Figure A.5.
C
B
FIGURE A.5 - CABLE ROUTING
A-5
INSTALLATION