Download Print this page

Confer Plastics ROLLGUARD 7200 Assembly, Installation And Use Manual page 5

A-frame ladder

Advertisement

STEP 3:
HANDRAILS/DECK
#1-3: Push handrails up through bottom of deck leaving about 3" exposed.
#4: Align the inside/outside
rails with deck/handrail.
#7: Install right and left
ladder bridges.
Tools needed:
Parts needed:
#5-6: Partially slide deck down locking handrails onto
ladder sections.
#9: Finish tapping
deck all the way
down until engaged
on to bridge.
rubber mallet, cordless drill w/Phillips driver
1- Deck
4- Handrails
1- Left bridge with lock assembly
1- Right bridge
2- #10 x 1-1/4" self tapping screws
2- 1/4 - 20 x 1" machine screws
2- 1/4 - 20 Hex Nuts
#8: Using the 1/4" - 20 x 1" screws and
hex nuts provided attach both outside
bridge tabs to the outside ladder rails
marked OL & OR. Insert screws through
from the inside and fasten with hex nuts
on the outside of rail. It may be neces-
sary to drill out holes using 5/16 drill bit
and cordless drill.
WARNING!
near pool may result in electrocution.
Using a corded drill
#10: Overlap the
flat sections at top
of the handrails
and connect using
1-#10 x 1-1/4" self
tapping screw.
Repeat for other
handrail.
5

Advertisement

loading