Installation Procedure for the Upgrade
Step 15. Install the LED Boards, Bulkhead Connectors, and Test Port
Coupler Assemblies to the 4-Port Test Set Front Plate
1. Remove two screws from each LED board and remove the boards from the
2. Remove the 12 bulkhead connectors, nuts and washers from the 2-port
3. Remove the 2-port test set front plate from the test set deck. Keep the
4. Follow the two instructions shown in
Figure 8
LED Board Assemblies and Test Port Coupler Assemblies Installation
22
2-port test set front plate of the PNA. Keep the screws and LED boards for
reuse later.
front plate to reuse later.
screws for reuse later, but dispose of the test set front plate.
Figure
8.
Installation Note N5222-90119