SECTION 2 - PREPARATION AND INSPECTION
6
2-6
5
7
10
11
2
9
8
3
Figure 2-1. Daily Walk-Around Inspection (EcoLift 50)
1
12
1. Swivel Castor
2. Platform
3. Auto-Lock Braked Wheels
4. Gates
5. Tool Tray
6. Flywheel Handle
7. Flywheel
4
8. Emergency Lowering Tool
9. Bubble Level Indicator
10. Mast Assembly
11. Lanyard Attach Point
12. Rubber Foot (Pad)
3121740