Test The System - Paradyne FrameSaver SLV 9580 T3 ATM DSU Installation Instructions Manual

Table of Contents

Advertisement

Test the System

"
*9580-A2-GZ40-10*
Copyright E 1999 Paradyne Corporation
18
Tests are started and stopped from the Test branch of the ATI.
Procedure
To access the Test branch:
1. Follow this menu selection sequence:
Main Menu
Test
2. Use the Tab key to select Abort All Tests or the test you would like to initiate,
then press Enter.
Select . . .
Physical Tests
Port- n PVC Tests
Network PVC Tests
IP Ping
LED Test
VCC Performance Monitoring
VCC Loopback and RTT
Estimation
Abort All Tests
If Test Timeout is enabled, user-initiated loopback and pattern tests end after the
number of minutes specified in Test Duration. If Test Timeout is disabled, tests
run indefinitely.
*9580–A2–GZ40–10*
June 1999
To . . .
Start and stop a physical test.
Start and stop a Permanent Virtual Circuit (PVC)
test in the direction of the DTE for a DLCI on
Port-1 or Port-2.
Start and stop a PVC test in the direction of the
network.
Display the menu for running the PING function.
Perform a lamp test.
Select Virtual Channel Connections (VCCs) for
monitoring.
Send test cells to the remote end of the ATM VCC
to estimate Round Trip Time (RTT).
Abort all active tests except DTE-initiated and
network-initiated tests.
9580-A2-GZ40-10

Advertisement

Table of Contents
loading

Table of Contents