Fig. 177
6.1.3.4.3
Check, adjust the idle speed
Fig. 178
6.1.3.5
Every 2000 operating hours
6.1.3.5.1
Checking fuel lines and clamps
1.
Turn the flywheel clockwise further Ä Fig. 177, until the
marks (2, 3) are in line.
2.
Check and , if necessary, adjust the valve clearance of the
2nd cylinder.
3.
After checking and adjusting reassemble the cylinder head
covers with new gaskets.
4.
Tighten the cylinder head screws.
After a short test run check the engine for leaks.
NOTICE!
We recommend to have this work carried out by
trained personnel or our after sales service.
Check and adjust only at operating temperature of
the engine.
Setting: 1400 ± 150 min
1.
Run the engine to warm it up to operating temperature.
2.
Adjust the engine idling speed with the setscrew (1)
Ä Fig. 178.
WARNING!
Danger of burning!
Perform inspection work only after the engine has
cooled down and with the engine stopped.
BW 900-50
Machine assemblies – Engine
-1
163
Need help?
Do you have a question about the Bomag BW 900-50 and is the answer not in the manual?