English
3.4 First Steps
1. Plug the supplied PowerCon cable into the connector (E). Turn plug to the right until it engages.
2. Put the mains plug into a socket outlet.
3. Now the base • prime is ready for use.
General information
When the machine is switched on, it takes 15 minutes for it to be ready for use. If the machine is already hot,
(> 290 ° C) then a power interruption is assumed and heated only 1 minute.
The Ready indicator is now completely green and stops flashing. From the moment the temperature does not
fog, the display lights, otherwise „NOT READY" is displayed.
The shutdown and control characteristics now depend more on the temperature, allowing for longer fogging. A
table with exact fogging time can be found in chapter 12.
If the heating element is warmer than 250 ° C it can be fogged up to 30%. If fogging takes place at a higher
level and the heating element cools down, it must heat up to 290 ° before starting a new misting process with
more than 30%.
In the screen „Pump Adjustment" instead of „p%" „max. 30% „is displayed. This is to indicate that the adjust-
ment is given only for the small pump. The small pump is only used in the 1-30% percentage range.
5
www.hazebase.com
Need help?
Do you have a question about the base-prime and is the answer not in the manual?