FusionModule2000 Smart Modular Data Center
Maintenance Guide
5.4.18 Replacing a Pad
Impact on the System
The pad cannot be used.
Preparations
Procedure
Step 1 Install the app on the reserved pad (see the commissioning guide) and connect the pad to the
network over the WiFi hotspot of the data center.
Step 2 Specify the user name and password for the app on the reserved pad and log in to check that
the app works properly.
Step 3 Remove the charging cable from the failed pad.
Step 4 Remove the failed pad from the support and install the reserved pad on the support.
Step 5 Connect the charging cable to the reserved pad.
----End
5.4.19 Replacing a Pad Power Connector
Context
Name
Pad power connector
Pad power connector
Pad power connector holder
Issue 04 (2020-01-03)
Tools: ESD wrist strap, ESD gloves, labels, and marker
Material: pad
Copyright © Huawei Technologies Co., Ltd.
Exterior
5 Parts Replacement
Description
The BOM number is
14190892.
The BOM number is
14190242.
Obtain it from the aisle door
accessories.
106