Draining The Heating Circuit And Hot Water Circuit; Drain The Solar Panel Circuit (Only Pressurised System); Final Shutdown - Daikin EKHWP300B Installation And Operating Instructions Manual

High-efficiency hot water storage tank
Hide thumbs Also See for EKHWP300B:
Table of Contents

Advertisement

6
x
Taking out of operation
4. Place a suitable collection trough beneath the filling and
emptying fitting.
CAUTION!
Storage water will gush out as soon as the seal-
ing plug is removed.
There is no valve and no non-return flap on the
filling and draining connection.
5. Unscrew the threaded
piece (fig. 6-5, item E) at
the filling and draining
connection, remove the
plug (fig. 6-5, item F) and
immediately screw in the
pre-assembled hose
connector (fig. 6-5, item C)
back into the filling and
draining connection.
6.2.4 Draining the heating circuit and hot water
circuit
● Connect the drain hose to the Daikin heat generator.
● Allow the heating and hot water circuits to drain using the
suction lifter method.
● Disconnect the heating flow and return and the cold water
feed and hot water discharge from the Daikin EKHWP /
EKHWC / EKHWD.
● Connect the discharge hose on the heating flow and return
flow as well as the cold water inflow and hot water outflow so
that the hose opening is at ground level.
● Allow the individual heat exchangers to run empty one after
the other based on the suction lifter method.
6.2.5 Drain the solar panel circuit (only pressurised
system)
CAUTION!
If heat transfer media containing glycol are ex-
posed to temperatures above 170 °C over an
extended period, they will decompose or form
silt. This may reduce the frost protection, affect
the output of the solar system and damage com-
ponents of the system.
● In the event of extended standstill of the solar
panel circuit drain in accordance with the
installation instructions of the regulating and
pump unit.
Installation and operating instructions
22
Fig. 6-5
Working steps 4 + 5

6.3 Final shutdown

● Disconnect the Daikin EKHWP / EKHWC / EKHWD from all
electrical and water connections.
● Dismantle the Daikin EKHWP / EKHWC / EKHWD in
accordance with the instruction manual (chapter 4 "Set-up
and installation") in reverse order.
● Dispose of the Daikin EKHWP / EKHWC / EKHWD in
accordance with regulations.
Recommendations for disposal
Daikin, thanks to the environmentally friendly design of
the EKHWP / EKHWC / EKHWD hot water storage
tank, has established the preconditions to ensure envi-
ronmentally friendly disposal. Proper disposal in com-
pliance with the respective national regulations of the country of
use is the responsibility of the user/owner.
The designation of the product means that electrical
and electronic products may not be disposed of to-
gether with unsorted domestic waste.
Proper disposal in compliance with the respective
national regulations of the country of use is the respon-
sibility of the user/owner.
● Only a qualified technician may disassemble the system.
● Disposal may only be carried out by a facility that specialises
in reuse, recycling and recovery.
Further information is available from the installation company or
the responsible local authorities.
Daikin EKHWP/EKHWC/EKHWD
Daikin High-efficiency hot water storage tank
008.1618744 – 03/2017

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents