Heating And Sanitary Side Connection; Operation; Instruct The Owner; Documentation - Daikin EKHWP300B Installation And Operating Instructions Manual

High-efficiency hot water storage tank
Hide thumbs Also See for EKHWP300B:
Table of Contents

Advertisement

2.4.5 Heating and sanitary side connection

● Create a heating system according to the
safety requirements of EN 12828.
● With a sanitary connection you must comply
with
– EN 1717 – Protection against pollution of
potable water installations and general
requirements of devices to prevent pollu-
tion by backflow
– EN 806 – Specifications for installations
inside buildings conveying water for human
consumption
– and, in addition, the country-specific legal
stipulations.
The domestic water quality must comply
with the EU Guideline 98/83 EC and the
regional applicable regulations.
The connection of a solar installation, an electric
heating rod or an alternative heat generator may
cause the storage temperature to exceed 60 °C.
● For this reason you should fit scalding
protection (e.g. VTA32 + Screw connection
set 1") during installation.
● Use a pressure reducer if the cold water
connection 
pressure >6 bar.
If the Daikin EKHWP / EKHWC / EKHWD is
connected to a heating system with steel pipes,
radiators or non-diffusion-proof floor heating
pipes, slurry and swarf could enter the hot water
storage tank and cause blockages, local
overheating or corrosion.
● To prevent possible damage, fit a dirt filter or
sludge separator into the heating return flow
of the system.
– SAS 1
Daikin EKHWP/EKHWC/EKHWD
Daikin High-efficiency hot water storage tank
008.1618744 – 03/2017

2.4.6 Operation

● Only operate the Daikin EKHWP / EKHWC /
EKHWD:
– After all installation and connection work
has been completed.
– With fully installed equipment covers and
service accesses.
– With sanitary side pressure reducers
installed (max. 6 bar).
– With heating side pressure reducers
installed (max. 3 bar).
– With completely filled storage containers
(fill level display).
The prescribed maintenance intervals must be
maintained and the inspection work must be
carried out.

2.4.7 Instruct the owner

● Before you hand over the heating system and
the hot water storage tank, explain to the
owner how he/she can operate and check the
heating system.
● Provide the operator with the technical
documentation (this documentation and all its
references) and indicate that these
documents must be available in the
immediate vicinity of the unit at all times.
● Document the hand-over by filling in and
signing the checklist in chapter 5 "Start-up",
together with the operator.

2.4.8 Documentation

The technical documentation contained in the
scope of supply is part of the device. It must be
stored in such a way that it can be consulted at
any time by the operator or the technicians.
2
x
Safety
Installation and operating instructions
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents