Download Print this page

Halsey Taylor OVL-I I Series Owner's Manual page 6

Electronic eye barrier-free water coolers refrigerated fountains with back panel

Advertisement

Figure 9 – OVL-II EREE-Q/OVL-II SREE-Q Rough-In
MODEL
OVL-SREE
MODEL
OVL-EREE
97882C - (Rev. F - 7/09)
OVLEREEQ*G OVLSREEQ*G OVLESREEQ*G OVLSEREEQ*G
Models
OVL-II EREE-Q – OVL-II SREE-Q
40
18
Figure 10 – Rough-In Assembly
Single-Station Mounting Frames
1.
Cut a rectangular wall opening 18-3/4" (475 mm) W x
37-3/4" H (959 mm) and 4-1/2" (114 mm) above the floor line
(see Figure 10). The dimensions are required to obtain
proper rim and bubbler heights for compliance with ANSI
standard A117.1.
2.
Reinforce the wall opening on all sides to adequately
support the water fountain. This reinforcement must support
up to 150 lbs. static load and provide a means for securing
the frame assembly in place.
NOTE: Building construction must allow for adequate air flow
on both sides and top of remote chiller unit.
Minimum of 4" (102 mm) is required.
3.
Install plumbing and electrical rough-ins. A junction box
for a (3) wire, 10 amp branch circuit is provided on the
inside of the chiller. (Standard 120 Volts, 60 Hz, and single
phase.)
4.
Remove frame and related hardware from packaging.
Release the two shelf rods by cutting cable ties.
6

Advertisement

loading

This manual is also suitable for:

Ovl-ii-eree-qOvl-ii-seree-qOvl-ii-sree-qOvl-ii-esree-q