Download Print this page

Halsey Taylor OVL-I I Series Owner's Manual page 4

Electronic eye barrier-free water coolers refrigerated fountains with back panel

Advertisement

Figure 6 – OVL-II SEREE-Q Rough-In
40
18
REVERSED CONFIGURATION:
HIGHER UNIT ON THE RIGHT
STANDARD CONFIGURATION:
HIGHER UNIT ON THE LEFT
97882C - (Rev. F - 7/09)
OVLEREEQ*G OVLSREEQ*G OVLESREEQ*G OVLSEREEQ*G
OVL-II SEREE-Q – OVL-II ESREE-Q
Figure 7 – Rough-In Assembly
Dual-Station Mounting Frames
Models
1.
Cut a rectangular wall opening 37-1/2" (953 mm) W x
37-3/4" H (959 mm) and 4-1/2" (114 mm) above the floor line
(see Figure 7). The dimensions are required to obtain proper
rim and bubbler heights for compliance with ANSI standard
A117.1.
2.
Reinforce the wall opening on all sides to adequately
support the water fountain. This reinforcement must support
up to 150 lbs. static load and provide a means for securing
the frame assembly in place.
NOTE:
Building construction must allow for adequate air
flow on both sides and top of remote chiller unit a
minimum of 4" (102 mm) is required.
3.
Install plumbing and electrical rough-ins. A junction box
for a (3) wire, 10 amp branch circuit is provided on the
inside of the chiller. (Standard 120 Volts, 60 Hz, and single
phase.)
4.
Remove frames and related hardware from packaging.
Release the two shelf rods by cutting cable ties. Attach the
two frames together through the upright supports with (4)
5/16" x 3/4" (19 mm) long bolts and nuts (provided). Tighten
securely.
4

Advertisement

loading

This manual is also suitable for:

Ovl-ii-eree-qOvl-ii-seree-qOvl-ii-sree-qOvl-ii-esree-q