Development Unit
12. Attach the new photoconductor unit.
Check whether powder has been applied to the photoconductor drum surface. The
customer engineer applies the powder.
13. If the photoconductor unit is not new, hold its flange and rotate it toward yourself
by 30 degrees.
14. Attach the new PCU cleaning unit.
66