TOP MOUNT
MOUNT BRACKET 4 SUPPLIED
BAR HANGER
(SUPPLIED
BY OTHERS)
CEILING
LAMP HSG
4 DROPWIRES
(MIN 20 lb LOAD)
MOUNT BRACKET
SCREW: 8 SUPPLIED
CEILING
15"-23"
MOUNT BRACKET 4 REQD.
15"-23"
B
PANEL CUTOUT
10"
B-CLIP
A
PANEL CUTOUT
CENTERED CUTOUT
12-48"
CENTER
HANGER
ALTERNATE
ROTATE B-CLIPS
POSITION
90° TO FIT BAR
10 1/2"
CONTROL BOARD
B
A
POWER SUPPLY
B-CLIP 4 REQD.
Backbox Installation
B-CLIP 4 SUPPLIED
1. For T-Bar installations, rotate side
bracket clips as required to fit T-Bar
MOUNT BRACKET
hangers. For masonry ceilings, attach
SCREW 8 REQD
side brackets to beam.
2.
Refer to table on Page 2 and make
cutout in ceiling panel.
7/8" K.O. 2 PLCS
LINE POWER 120 VAC
GENERATOR FEED 120 VAC
BACKBOX MUST BE FLUSH WITH
TOP (INSIDE) SURFACE. IN MASONRY
CEILINGS, SUPPORT WITH DROP
WIRES AND FRAMING AS REQUIRED
HANGERS AS
REQUIRED
11 3/4"
BEAM CENTER
-2-
Series CVRAC
PANEL THICKNESS
RANGE 3/8" - 1 3/8"
24"-48"
REV 03.11.1
Need help?
Do you have a question about the Coverlite CVRAC Series and is the answer not in the manual?