CHIEF MWRSKU Installation Instructions Manual

Medium flat panel steel stud wall mount

Advertisement

Quick Links

I N S T A L L A T I O N I N S T R U C T I O N S
Instrucciones de instalación
Installationsanleitung
Instruções de Instalação
Medium Flat Panel Steel Stud Wall Mount
Istruzioni di installazione
Installatie-instructies
Instructions d´installation
Spanish Product Description
German Product Description
Portuguese Product Description
Italian Product Description
Dutch Product Description
French Product Description
MWRSKU

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MWRSKU and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for CHIEF MWRSKU

  • Page 1 I N S T A L L A T I O N I N S T R U C T I O N S Instrucciones de instalación Istruzioni di installazione Installationsanleitung Installatie-instructies Instruções de Instalação Instructions d´installation Medium Flat Panel Steel Stud Wall Mount Spanish Product Description German Product Description Portuguese Product Description Italian Product Description Dutch Product Description French Product Description MWRSKU...
  • Page 2: Installation Instructions

    Chief® and ClickConnect™ are a registered trademarks of injury or damage to equipment! It is the installer’s Milestone AV Technologies. All rights reserved.
  • Page 3 Installation Instructions MWRSKU DIMENSIONS Mounting Pattern NOTE: CUSTOM INTERFACE BRACKET PRODUCT FEATURES NOT SHOWN. THE CUSTOM INTERFACE WEIGHT CAPACITY 125 LBS BRACKET NEEDED FOR YOUR DISPLAY HEIGHT ADJUSTMENT 0" WILL ADD BETWEEN 1/2" AND 2" IN DEPTH AND MAY AFFECT LOCATION OF DISPLAY TILT / ROLL / YAW +5 ,-15 / 2.5 / 0...
  • Page 4 MWRSKU Installation Instructions TOOLS REQUIRED FOR INSTALLATION AND PARTS 1/2" (Ø13mm) A (1) B (8) (1/4") C (8) (1/4"-20 x 1 3/4") E (2) D (8) (1/4"-20 SNAPTOGGLE BB) F (1) G (4) H (1) J (2) K (12)
  • Page 5: Site Requirements

    Installation Instructions MWRSKU Site Requirements IMPROPER INSTALLATION CAN LEAD TO EQUIPMENT FALLING CAUSING SERIOUS PERSONAL INJURY WARNING: OR DAMAGE TO EQUIPMENT! The figure below identifies the minimum reguirements for installation of display mounts onto a steel stud structure. If the structure or its components do not meet these requirements contact the mount manufacturer for specificinstructions before attempting installation.
  • Page 6 MWRSKU Installation Instructions Holding plastic straps on anchor (D), pull anchor away from Mount Installation And Adjustment wall until channel rests flush behind wall making sure Mount Installation anchor channel is positioned vertically on stud as show in figues below. (See Figure 4)
  • Page 7: Cover Installation

    Installation Instructions MWRSKU Cover Installation To install channel covers: IMPROPER INSTALLATION CAN LEAD TO WARNING: EQUIPMENT FALLING CAUSING SERIOUS PERSONAL Install upper wall channel cover (E) by tipping cover top INJURY OR DAMAGE TO EQUIPMENT! Overtightening of down and positioning as shown in figure below.
  • Page 8: Cable Management

    If the display has any other mounting pattern an interface bracket must be obtained before proceeding. Consult a Chief Customer Service Remove pin representative if an interface bracket is required by calling and nuts and 1-800-582-6480 or visit www.chiefmfg.com.
  • Page 9 Installation Instructions MWRSKU (K) x 4 From Display Figure 10 ADJUSTMENTS Pitch Tension Adjustment To adjust display pitch tension: With display installed, tighten or loosen two screws, one on each side, using the 5/32” hex wrench. (See Figure 11) Check for desired tension.
  • Page 10 MWRSKU Installation Instructions Roll Adjustment The MWR allows for the horizontal alignment (Roll)of the (D) x 1 display to be adjusted up to 2 deg. right or left to level the display after installing. (C) x 1 To adjust Roll: Loosen the roll tension adjustment nut located on the back side of the faceplate assembly.
  • Page 11 Installation Instructions MWRSKU...
  • Page 12 F 877.894.6918 / 952.894.6918 A Fellenoord 130 5611 ZB EINDHOVEN, The Netherlands Europe P +31 (0)40 2668620 Chief Manufacturing, a division of F +31 (0)40 2668615 Milestone AV Technologies A Room 24F, Block D, Lily YinDu International Building Asia Pacific 8832-000222 RevD LuoGang, BuJi Town, Shenzhen, CHINA.

Table of Contents