Installation
Install the Metered Dispense Valve in the Oil Bar
1.
Wrap threads of pipe nipple (8) with
PTFE tape or thread sealant as shown in
F
. 8. Install pipe nipple (8) in opening of
IG
manifold (2). Tighten securely. Refer to
F
. 8 to determine the correct
IG
installation position.
8
2
F
. 8
IG
If installed when assembling the Oil
2.
Bar, remove screws (27) and remove
access panel (25).
25
F
. 9
IG
4
Sealant
or PTFE
Tape
24
27
3.
Position manifold (2) inside oil bar,
orienting opening (a) on the front of the
manifold with opening (b) in the
mounting plate (24) as shown in F
2
F
. 10
IG
4.
Install screws (5) and washers (4) to hold
the manifold (2) in place. Tighten
securely.
F
. 11
IG
a
b
2
24
4
5
3A5573C
. 10.
IG
24