Table Of Contents; Mounting Hardware - CHIEF SLMU Installation Instructions Manual

Universal
Table of Contents

Advertisement

Installation Instructions
CONTENTS
DIMENSIONS............................................................... 2
SHIPPING CONTENTS ................................................ 2
MOUNTING HARDWARE .......................................... 3
PARTS .......................................................................... 4
INSTALLATION INSTRUCTIONS.............................. 5
Projector ........................................................................ 5
Adjusting the Legs on Bracket........................................ 6
Projector with 4 Mounting Holes ................................ 6
Aligning the SLBU/SLMU (minus 1 adjustable leg)
on a Projector with 3 Mounting Holes ......................... 7
Aligning the SLBU/SLMU (using horizontal slot) on
a Projector with 3 Mounting Holes.............................. 8
direct mounting option................................................ 9
Adjusting Foot Height on SLB-U ................................... 10

MOUNTING HARDWARE

Table 1. Mounting Hardware
ITEM
DESCRIPTION
10
SLBU/SLMU
Assembly
20
M6 x 12mm Phillips
Pan Head Screw
30
M5 x 12mm Phillips
Pan Head Screw
40
M4 x 10mm Phillips
Pan Head Screw
50
M3 x 10mm Phillips
Pan Head Screw
60
M2.5 x 10mm
Phillips Pan Head
Screw
70
M6 Flat Washer
Used with screws
(20) and (30)
80
M4 Flat Washer
Used with screws
(40) and (50)
90
10-24 Thumb Nuts
Table 2. Direct Mounting (without foot brackets)
ITEM
DESCRIPTION
1200
M6 x 20mm Phillips
Pan Head Screw
110
M5 x 20mm Phillips
Pan Head Screw
120
M4 x 20mm Phillips
Pan Head Screw
130
M3 x 20mm Phillips
Pan Head Screw
SLBU/SLMU
QTY
NOTES
1
4
Used with M6
Flat Washers
(70)
4
4
Used with M4
4
Flat Washers
(80)
4
4
4
Used to attach
4
SLBU to RPA
QTY
NOTES
4
Used with M6
Flat Washers
(70)
4
4
Used with M4
Flat Washers
(80)
4
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Slbu

Table of Contents