Mechanical Assembly
1.
Start by pressing the nuts into place on the wheel bearing hubs. There will be 8 nuts and two bearing hubs.
Sometimes it helps to use one of the #4 machine screws to hammer the nuts into the counter bored holes.
SuperDroid Robots, Inc
224 Technology Park Lane
Fuquay Varina, NC 27526
www.SuperDroidRobots.com
Revised: May 22, 2018
MLT-JR Tracked Robot Platform
Parts of the MLT-JR robot kit.
Contact
(919) 557-9162
SDR@SDRobots.com
Page 4 of 13
Need help?
Do you have a question about the MLT-JR and is the answer not in the manual?