Adjustment Procedure - 067-1039-00
6.
Turn on the TM 500 mainframe and allow a 30-minute warmup.
ADJUSTMENT
PROCEDURE
1.
Adjust Power Supply
a.
Connect
a
1X probe to the digital
voltmeter.
Clip the probe
to TP174 on the Vertical
Sync Generator
board on the right
side of the
instrument
(see Fig.
4-9).
b.
Adjust R275 to obtain
a meter reading
of +15 V
+/-
0.01 V.
c.
Disconnect
probe from TP174.
Fig. 4-9 Adjustment Locations
on the Vertical
Sync Generator
Board