Bearing Adjustment - Tiger JD 5083E Mounting And Operating Instructions

Cheetah boom assemblies
Hide thumbs Also See for JD 5083E:
Table of Contents

Advertisement

MAINTENANCE

BEARING ADJUSTMENT

1 – Clamp the bottom end of the spindle securely in a vise so the spindle housing turns
freely.
2 – Position a magnetic base dial indicator on the outer diameter of the spindle housing.
Locate the end of the dial indicator against the flat end of the spindle shaft. The dial
indicator will now measure accurately bearing end play.
3 – Tighten the bearing adjustment nut until there is .012 inch movement when the
spindle housing is pried upward away from the vise jaws.
4 – When there is .012 inch free play between the spindle and housing, install the
bearing lock nut (thick nut). Hold the adjusting nut securely and tighten the lock nut to
300 ft. lbs. of torque.
5 – After the lock nut is tightened, there must be .001 inch to .003 inch of free play when
lightly prying up on the spindle housing.
If the end play is correct, .001 inch to .003 inch, bend tabs up on jam washer to prevent
the lock nut from loosening.
If the end play in NOT correct, loosen the lock nut and turn the adjustment nut as required
and re-tighten the lock nut. Repeat first part of step 5.
Cheetah Maintenance Section 4-18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents