Connecting The Battery - SolarEdge StorEdge Installation Manual

Three phase inverter with setapp configuration
Hide thumbs Also See for StorEdge:
Table of Contents

Advertisement

33
  Connecting the Battery
 4. Insert the meter wires into the connector as shown below and tighten them with the
screws.
 5. Connect the connector back to the RS485-1 port.
 6. Make sure the RS485-1 DIP switch (the left switch) is OFF.
 7. Make sure the Energy Meter's DIP switch 2 is ON.

Connecting the Battery

WARNING!
The battery must be powered off before and during wiring.
For connecting the battery to the inverter, use copper cables with the following
parameters:
Maximum length: 5m
Cross-section area: 35 or 50 mm
Connecting DC Cables
 1. Make sure the battery circuit breaker is OFF.
 2. Make sure DC to the inverter is OFF.
 3. Strip the required length of the battery's DC cables.
Figure 16: Meter Connection 2
2
StorEdge Three Phase Inverter Installation Guide MAN-01-00648-1.1

Advertisement

Table of Contents
loading

Table of Contents