20
  Inverter Interfaces

Inverter Interfaces

The following figure shows the inverter connectors and components, located at the
bottom of the inverter.
AC output: AC output gland, AC cable external gauge, M32 (15-21mm diameter) for
connection to the grid
DC input: MC4 connector, for connection of the PV installation.
Two communication glands: for connection of inverter communication options.
Each gland has three openings. Refer to Setting Up Communication to the
Monitoring Platform on page 52 for more information.
Battery DC inputs: Two battery glands for connecting charging cables (+ and -)
ON/OFF/P switch:
Figure 5: Inverter Interfaces
Figure 6: ON/OFF/P switch