I N S T A L L A T I O N I N S T R U C T I O N S
INTERLOCKING PANELS
3. Push panels together (horizontally and/or vertically) by inserting alignment pins of one panel into the
marrying interlocks of another panel. Once alignment pins are fully inserted, LOCK/CLOSE interlocks on
panels by pulling up and holding lock while turning 45 degrees to 12/6 o'clock position. MAKE SURE
EACH INTERLOCK IS COMPLETELY IN THE 12/6 O'CLOCK LOCK/CLOSE POSITION AND EACH
ALIGNMENT PIN AROUND TAB IS IN THE LOCKED POSITION!
INTERLOCK
LOCK/CLOSE
POSITION
4. Repeat steps 1-3 for as needed for each horizontally/vertically connected panel.
OVERHEAD RIGGING
Overhead rigging requires extensive experience, including amongst others calculating working load limits,
installation material being used, and periodic safety inspection of all installation material and the fixture.
If you lack these qualifications, do not attempt the installation yourself. Improper installation can result in
bodily injury and property damage.
14