JCM UBA Pro RQ Series Integration Manual

JCM UBA Pro RQ Series Integration Manual

Banknote recycler
Table of Contents

Advertisement

Website: http://www.jcmglobal.com
UBA Pro RT/RQ™ Series
Banknote Recycler
Integration Guide
Revision A, October 23, 2019
P/N 960-000209R_Rev. A
Issue #4115-IGE-01-00
© 2019, JAPAN CASH MACHINE CO., LTD.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UBA Pro RQ Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for JCM UBA Pro RQ Series

  • Page 1 Website: http://www.jcmglobal.com UBA Pro RT/RQ™ Series Banknote Recycler Integration Guide Revision A, October 23, 2019 P/N 960-000209R_Rev. A Issue #4115-IGE-01-00 © 2019, JAPAN CASH MACHINE CO., LTD.
  • Page 2 2. When an end user duplicates the Manual to maintain operation of the product or operate the product in general. JCM retains all rights to amend, alter, change or delete any portion of this Manual in whole, or in part, or add items thereto without notice regarding the product or its related products.
  • Page 3: Table Of Contents

    UBA Pro RT/RQ™ Series Banknote Recycler Table of Contents Page 1 GENERAL INFORMATION ..................1 RT and RQ Units.........................1 Model Descriptions ......................2 Type Descriptions ......................2 Software Descriptions .......................2 Precautions.........................2 User Cautions ........................3 Installation Cautions........................3 Mounting, Dismounting & Transportation..................3 Operation Cautions ......................... 3 Preventive Maintenance.......................3 Disposal Considerations ......................4 Banknote Fitness Requirements ..................4...
  • Page 4 RQ Unit With Large Box Outside Dimensions and Installation/Maintenance Space Requirement........................42 Bezel Outside Dimensions ....................43 10 TECHNICAL CONTACT INFORMATION ..............44 Americas ..........................44 JCM American ..........................44 Europe, Middle East, Africa & Russia ................44 P/N 960-000209R_Rev. A © 2019, JAPAN CASH MACHINE CO., LTD.
  • Page 5 UBA Pro RT/RQ™ Series Banknote Recycler Table of Contents Page JCM Europe GmbH........................44 UK & Ireland........................44 JCM Europe (UK Office) ....................... 44 Asia and Oceania.......................44 JCM Gold (HK) Ltd........................44 JAPAN CASH MACHINE CO., LTD. (HQ) ..................44 11 INDEX ........................45 P/N 960-000209R_Rev.
  • Page 6 THIS PAGE INTENTIONALLY LEFT BLANK P/N 960-000209R_Rev. A © 2019, JAPAN CASH MACHINE CO., LTD.
  • Page 7 UBA Pro RT/RQ™ Series Banknote Recycler List of Figures Page Figure 1 RQ and RT Units ..................1 Figure 2 Precautionary Symbols ................2 Figure 3 Unacceptable Banknotes ................4 Figure 4 RT/RQ Component Locations ..............5 Figure 5 Grounding ....................9 Figure 6 Side Installation (Standard and SU Installation Types) ......9 Figure 7 Bottom Installation (Standard Installation Type) ........10 Figure 8...
  • Page 8 UBA Pro RT/RQ™ Series Banknote Recycler List of Figures Page Figure 44 RT/RQ Collecting in Cash Box Flow Process 2 ........35 Figure 45 RT Unit With SH2 Box Outside Dimension and Installation/ Maintenance Space Requirement ............39 Figure 46 RT Unit With Large Box Outside Dimension and Installation/ Maintenance Space Requirement ............
  • Page 9 UBA Pro RT/RQ™ Series Banknote Recycler List of Tables Page Table 1 RT/RQ Product Model Number Specifications..........2 Table 2 RT/RQ Type Number Specifications ............2 Table 3 RT/RQ Software Number Specifications.............2 Table 4 RT/RQ Component Names .................6 Table 5 RT/RQ Technical Specifications ..............7 Table 6 RT/RQ Environmental Specifications............8 Table 7...
  • Page 10 THIS PAGE INTENTIONALLY LEFT BLANK P/N 960-000209R_Rev. A © 2019, JAPAN CASH MACHINE CO., LTD. v i i i...
  • Page 11: General Information

    UBA Pro RT/RQ™ Series Banknote Recycler Integration Guide R e v i s i o n A GENERAL INFORMATION This section provides a general overview of the • Primary Features UBA Pro RT/RQ™ Series Banknote Recycler (RT/ • Component Names RQ) pictured in Figure 1.
  • Page 12: Model Descriptions

    Section 1 UBA Pro RT/RQ™ Series Banknote Recycler General Information Model Descriptions Table 2 RT/RQ Type Number Specifications Table 1 lists the RT/RQ Product Model Num- Type: * * * - * * - * * * * * * * ber Descriptions.
  • Page 13: User Cautions

    General Information UBA Pro RT/RQ™ Series Banknote Recycler Section 1 User Cautions 4. Check that the UBA Pro Unit does not drop off the Unit Frame while pulling the Recycler for- Careful measures are taken in the design of this ward from the Frame.
  • Page 14: Disposal Considerations

    Able to stack up to 800 Banknotes in the plastic battery disposal. Cash Box (only Large Box). Banknote Fitness Requirements • The JCM patented Anti-Pullback Mechanism The following Banknote types may not validate provides powerful protection against Banknote stringing operations. correctly, or can cause a Banknote jam and/or dam- age to the Unit’s Transport path.
  • Page 15: Transport Unitcomponent Names

    General Information UBA Pro RT/RQ™ Series Banknote Recycler Section 1 Transport UnitComponent Names Figure 4 illustrates the RT/RQ component names and locations. Figure 4 RT/RQ Component Locations Recycler Direction for RT Transport Recycler Direction RT Unit RQ Unit for RQ Transport (flipped) UBA Pro Bottom View Recycler Installation Type...
  • Page 16 Section 1 UBA Pro RT/RQ™ Series Banknote Recycler General Information Table 4 RT/RQ Component Names Sym. Description Sym. Description Acceptor Head Unit (UBA Pro) Recycler (RT Transport) Upper Guide Access Lever Recycler (RQ Transport) Bezel Cash Box Acceptor Head Unit Release Lever 1 Transport Unit 1 DIP Switches (Front) 2 Front Transport Unit...
  • Page 17: Specifications

    Approx. 2.7 seconds (from Drum 1) Escrow: 1 Note Validation Method: Optical Anti-Pullback Mechanism: Pull-Back (PB) Unit (Anti-pullback System - JCM Patented) Acceptor Head Unit (UBA Pro): Status LEDs (Red/Green) Diagnostic Indicators: RT/TQ Unit: Full-color LEDs (White/Yellow/Red/Green/Magenta/Cyan/Blue) SH2 Box (Metal): Secure Type ††...
  • Page 18: Environmental Specifications

    Section 2 UBA Pro RT/RQ™ Series Banknote Recycler Specifications Table 5 RT/RQ Technical Specifications (Continued) RT Unit: Max. 60 Notes (Max. 30 Notes x 2 Drums) Recycler Capacity RQ Unit: Max. 120 Notes (Max. 30 Notes x 4 Drums) USB (USB Specification Rev. 2.0 Compliance) (Full Speed/12Mbps) Photo-Coupler Isolation Interfaces: RS232C...
  • Page 19: Installation

    Installation UBA Pro RT/RQ™ Series Banknote Recycler Section 3 INSTALLATION This section provides installation and operating Figure 5 Grounding instructions for the UBA Pro RT/RQ™ Series Banknote Recycler (RT/RQ). The information within contains the following features: • Installation Procedure • Cable Interconnection •...
  • Page 20: Bottom Installation (For Standard Installation Type Only)

    Section 3 UBA Pro RT/RQ™ Series Banknote Recycler Installation Bottom Installation (For Standard External Harness Installation Installation Type Only) NOTE: Prepare the following Screw: When a bottom mounting configuration is preferred, • M3x12 Screw (provided) perform the following procedure: • Tightening Torque: 80N·cm Caution: This installation is allowed only when the RT/RQ unit is used as Standard...
  • Page 21: Unlock Procedure

    The customer is responsible for selecting a Lock Bottom View with performance that fits the intended purpose. JCM does not test or endorse any specific brand of Lock for its security Figure 14 SW1 and SW2 Switches characteristics.
  • Page 22: Interface And Recycler Settings (Sub Board 2)

    Section 3 UBA Pro RT/RQ™ Series Banknote Recycler Installation Interface and Recycler Settings (Sub Board 2) The SW1 switch equipped on the Sub Board 2 is to set an interface RS232C, Photo-Coupler Isolation, or ccTalk (Table 10). NOTE: For the USB interface, no need to configure the SW1 switch.
  • Page 23: Led Flashing Patterns

    Installation UBA Pro RT/RQ™ Series Banknote Recycler Section 3 LED Flashing Patterns The LED Color Pattern indications listed in Table 11 and Table 12 occur during various RT/RQ Unit oper- ating and error conditions. NOTE: Refer to “LED Error Codes” on page 36 for a detailed explanation of each error code. Table 11 Recycler and Transport LEDs Flashing Patterns Recycler LED Cause and Solution...
  • Page 24: Connector Pin Assignments

    Section 4 UBA Pro RT/RQ™ Series Banknote Recycler Connector Pin Assignments CONNECTOR PIN ASSIGNMENTS This section provides the pin assignments of the UBA Pro RT/RQ™ Series Banknote Recycler (RT/RQ). The information within contains the following features: • USB Interface Connector Pin Assignments (UBA Pro Side) •...
  • Page 25: Photo Coupler Interface Connector Pin Assignments (Uba Pro Side)

    Connector Pin Assignments UBA Pro RT/RQ™ Series Banknote Recycler Section 4 Photo Coupler Interface Connector Pin Assignments (UBA Pro Side) NOTE: The Interface setup is required. Refer to “Interface and Recycler Settings (Sub Board 2)” on page 12 for the settings. Table 14 Photo Coupler Interface Connector Pin Assignments (UBA Pro Side) Socket (UBA Pro Unit Side): DRA-20PC-FO (JAE) Contact (UBA Pro Unit Side): D02-22-26P-10000 (JAE)
  • Page 26: Rs232C Interface Connector Pin Assignments (Uba Pro Side)

    Section 4 UBA Pro RT/RQ™ Series Banknote Recycler Connector Pin Assignments RS232C Interface Connector Pin Assignments (UBA Pro Side) NOTE: The Interface setup is required. Refer to “Interface and Recycler Settings (Sub Board 2)” on page 12 for the settings. Table 15 RS232C Connector Pin Assignments (UBA Pro Side) Socket (UBA Pro Unit Side): DRA-20PC-FO (JAE) Contact (UBA Pro Unit Side): D02-22-26P-10000 (JAE)
  • Page 27: Cc-Talk Interface Connector Pin Assignments (Uba Pro Side)

    Connector Pin Assignments UBA Pro RT/RQ™ Series Banknote Recycler Section 4 cc-Talk Interface Connector Pin Assignments (UBA Pro Side) NOTE: The Interface setup is required. Refer to “Interface and Recycler Settings (Sub Board 2)” on page 12 for the settings. Table 16 cc-Talk Interface Connector Pin Assignments (UBA Pro Side) Socket (UBA Pro Unit Side): DRA-20PC-FO (JAE) Contact (UBA Pro Unit Side): D02-22-26P-10000 (JAE)
  • Page 28: Power Supply Connector Pin Assignments (Rt/Rq Side)

    Section 4 UBA Pro RT/RQ™ Series Banknote Recycler Connector Pin Assignments Power Supply Connector Pin Assignments (RT/RQ Side) Table 17 Power Supply Connector Pin Assignments (RT/RQ Side) Header Type: 43045-0424 (MOLEX) Contact Type: 43030-0001 (MOLEX) Housing: 43025-0400 (MOLEX) Recommended Wires: Slit Wire UL1007 AWG #20-24 Pin No.
  • Page 29: Preventive Maintenance

    Preventive Maintenance UBA Pro RT/RQ™ Series Banknote Recycler Section 5 PREVENTIVE MAINTENANCE This section provides the preventive maintenance Figure 16 Collecting Banknotes 1 for the UBA Pro RT/RQ™ Series Banknote Recy- cler (RT/RQ). It includes the following informa- tion: • Refilling Banknotes •...
  • Page 30: Clearing A Banknote Jam

    Section 5 UBA Pro RT/RQ™ Series Banknote Recycler Preventive Maintenance Clearing a Banknote Jam 3. Remove any jammed Banknote found there (Fig- ure 20 c). NOTE: Do Not re-insert a removed Figure 20 RT Transport Banknote Jam Clear 2 Banknote caused by Banknote Jam or error.
  • Page 31: Jammed In Rq Transport

    Preventive Maintenance UBA Pro RT/RQ™ Series Banknote Recycler Section 5 8. Remove any jammed Banknote found there (Fig- 5. Remove any jammed Banknote found there (Fig- ure 23 b). ure 26 c). Figure 23 RT Transport Banknote Jam Clear 5 Figure 26 RQ Transport Banknote Jam Clear 3 Figure 23 RT Transport Banknote Jam Clear 5 Jammed in RQ Transport...
  • Page 32: Jammed In Recycler Drum

    Section 5 UBA Pro RT/RQ™ Series Banknote Recycler Preventive Maintenance Jammed in Recycler Drum Figure 31 Recycler Drum Banknote Jam Clear 3 To remove jammed Banknotes from the Recycler Drum, proceed as follows to clear it. NOTE: Be sure to send a command and update the number of Banknotes in the Recycler(s) after removing a jammed Banknote in order to maintain the...
  • Page 33 Preventive Maintenance UBA Pro RT/RQ™ Series Banknote Recycler Section 5 Caution: DO NOT use alcohol, solvents, abrasive cleaning agents, or citrus- based cleaners that can damage the plastic surface of the device when cleaning it. The lenses can become clouded by chemical evaporation residue that may cause acceptance errors.
  • Page 34: Sensor, Roller And Belt Cleaning Locations

    Section 5 UBA Pro RT/RQ™ Series Banknote Recycler Preventive Maintenance Sensor, Roller and Belt Cleaning Locations Figure 34 illustrates the various RT/RQ Unit’s sensor and roller cleaning locations. Figure 34 RT/RQ Sensor, Roller and Belt Clean- RT Unit ing Locations RQ Unit Recycler NOTE: Refer to the UBA Pro Series Universal Banknote Acceptor Operation and Maintenance...
  • Page 35 Preventive Maintenance UBA Pro RT/RQ™ Series Banknote Recycler Section 5 Table 20 RT/RQ Sensor Cleaning Methods Sym. Sensors Cleaning Method Note Position Sensor A (RT Transport) Note Position Sensor B (RT Transport) Note Position Sensor C (RT Transport) Wipe clean using a dry lint free cloth/cotton swab Note Position Sensor D (RQ Transport) Note Position Sensor E (RQ Transport) Note Position Sensor F (RQ Transport)
  • Page 36 Section 5 UBA Pro RT/RQ™ Series Banknote Recycler Preventive Maintenance THIS PAGE INTENTIONALLY LEFT BLANK P/N 960-000209R_Rev. A © 2019, JAPAN CASH MACHINE CO., LTD.
  • Page 39: Operational Flowchart

    Operational Flowchart UBA Pro RT/RQ™ Series Banknote Recycler Section 7 OPERATIONAL FLOWCHART This section provides operational flowcharts of the UBA Pro RT/RQ™ Series Banknote Recycler (RT/ RQ). RT/RQ Main Flow Process Figure 37 RT/RQ Main Flow Process Apply Power to the Unit. Power On a) Initializing A) Return from “h”...
  • Page 40: Rt/Rq Accepting Banknotes Flow Process

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Operational Flowchart RT/RQ Accepting Banknotes Flow Process Figure 38 RT/RQ Accepting Banknotes Flow Process B1) From “Main” flowchart (Figure 37) a) Take the Banknote in b) Centering the Banknote c) Transporting the Banknote d) Sampling the Banknote Data e) Stop Transportation f) Is the Banknote authentic?
  • Page 41: Rt/Rq Transporting To Recycler Flow Process

    Operational Flowchart UBA Pro RT/RQ™ Series Banknote Recycler Section 7 RT/RQ Transporting to Recycler Flow Process Figure 39 RT/RQ Transporting to Recycler Flow Process C1) From “Accepting Banknotes” flowchart (Figure 38) a) Transporting the Banknote to the Recycler b) Was the Banknote transported to the Recycler? c) Retried the transportation operation three (3) times? d) Rotate the Anti-Pullback (PB) Unit e) Was an Abnormal Error detected by the PB Unit?
  • Page 42: Rt/Rq Transporting To Cash Box Flow Process

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Operational Flowchart RT/RQ Transporting to Cash Box Flow Process Figure 40 RT/RQ Transporting to Cash Box Flow Process C2) From “Accepting Banknotes” flowchart (Figure 38) a) Transporting the Banknote to the Cash Box b) Was the Banknote transported to the Cash Box? c) Retried the transportation operation three (3) times? d) Rotate the Anti-Pullback (PB) Unit...
  • Page 43: Rt/Rq Dispensing Flow Process (Normal)

    Operational Flowchart UBA Pro RT/RQ™ Series Banknote Recycler Section 7 RT/RQ Dispensing Flow Process (Normal) Figure 41 RT/RQ Normal Dispensing Flow Pro- cess B2) From “Main” flowchart (Figure 37) F) Return from “j” in this flowchart a) Transporting the Banknote b) Sampling the Banknote Data c) Is the Banknote in an abnormal condition? E) To “E”...
  • Page 44: Rt/Rq Dispensing Flow Process (Abnormal)

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Operational Flowchart RT/RQ Dispensing Flow Process (Abnormal) Figure 42 RT/RQ Abnormal Dispensing Flow E) From “Dispensing (Normal)” flowchart (Figure 41) Process a) Is the Banknote still in the abnormal condition (second time)?(*1) b) Sending an Abnormal Operation Signal c) Was the Banknote transported out of the Recycler? d) Stop transporting the Banknote...
  • Page 45: Rt/Rq Collecting In Cash Box Flow Process 2

    Operational Flowchart UBA Pro RT/RQ™ Series Banknote Recycler Section 7 RT/RQ Collecting in Cash Box Flow Process 2 Figure 44 RT/RQ Collecting in Cash Box Flow Process 2 C3) From “Collecting in Cash Box 2” flowchart (Figure 43) a) Transporting the Banknote to the Cash Box b) Was the Banknote transported to the Cash Box? c) Retried the transportation operation three (3) times? d) Stop operation (Abnormal Signal Output (*1)
  • Page 46: Troubleshooting

    Section 8 UBA Pro RT/RQ™ Series Banknote Recycler Troubleshooting TROUBLESHOOTING This section provides Troubleshooting instructions in Section 4 of the RT/RQ Operation and Mainte- nance Manual. for the UBA Pro RT/RQ™ Series Banknote Recy- cler (RT/RQ). This section contains the following Troubleshooting Overview information: This product allows the Operator to perform fault...
  • Page 47 Troubleshooting UBA Pro RT/RQ™ Series Banknote Recycler Section 8 Table 21 LED Error Codes (Continued) * Status LED color shows the Unit‘s operation White: While powering up Blue: After dispensed Green: Stand-by Yellow: While accepting Magenta: While collecting Red: After accepted Cyan: While dispensing Recycler Transport...
  • Page 48 Section 8 UBA Pro RT/RQ™ Series Banknote Recycler Troubleshooting Table 21 LED Error Codes (Continued) * Status LED color shows the Unit‘s operation White: While powering up Blue: After dispensed Green: Stand-by Yellow: While accepting Magenta: While collecting Red: After accepted Cyan: While dispensing Recycler Transport...
  • Page 53: Bezel Outside Dimensions

    Unit Dimensions UBA Pro RT/RQ™ Series Banknote Recycler Section 9 Bezel Outside Dimensions Figure 49 illustrates the Bezel Outside Dimensions. Figure 49 Bezel Outside Dimensions 25.1 25.1 For Stacking Up (SU) Installation For Standard Installation NOTE: All dimensions in millimeters Figure 49 Bezel Outside Dimensions P/N 960-000209R_Rev.
  • Page 54: 10 Technical Contact Information

    E-mail: support@jcmglobal.eu JAPAN UK & Ireland E-mail: Shohin@jcm-hq.co.jp JCM Europe (UK Office) Phone: +44 (0) 190-837-7331 The JCM Website for all locations is: Fax: +44 (0) 190-837-7834 http://www.jcmglobal.com Unit B, Third Avenue Denbigh West Business Park Bletchley, Milton Keynes, Buckinghamshire MK1 1DH, UK E-mail: support@jcmglobal.eu...
  • Page 55 UBA Pro RT/RQ™ Series Banknote Recycler Index 11 INDEX Recycler ...1, 7, 9, 14, 19, 27, 29, 36, 39 acronym for a RT/RQ Banknote Jam UBA Pro RT/RQ Series Banknote Recycler clearing a ...19 ...1, 7, 9, 14, 19, 27, 29, 36, 39 acronym for a Contact Information Software Descriptions...
  • Page 56 Section 11 UBA Pro RT/RQ™ Series Banknote Recycler Index THIS PAGE INTENTIONALLY LEFT BLANK P/N 960-000209R_Rev. A © 2019, JAPAN CASH MACHINE CO., LTD.
  • Page 57 UBA Pro RT/RQ™ Series Banknote Recycler P/N 960-000209R_Rev. A © 2019, JAPAN CASH MACHINE CO., LTD.
  • Page 58 UBA Pro RT/RQ™ Series Banknote Recycler Issue #4115-IGE-01-00 P/N 960-000209R_Rev. A © 2019, JAPAN CASH MACHINE CO., LTD.

This manual is also suitable for:

Uba pro rt series

Table of Contents