Download Print this page

John Louis Home 38373 Assembly Instructions Manual page 4

Solid wood closet system

Advertisement

Available languages

Available languages

Step 3 - Primary Shelf Locations
1.
Using the height location measurements for the (A) shelves, measure
from the floor up and mark the top shelf location on the back closet
wall. (Fig. 3.0)
2.
Draw level line equal to shelf length for top shelf onto back closet wall
(Fig. 3.1) (Shelving will cover lines drawn onto wall).
3.
Using the height location measurements for the lower (A) shelves on
grid, measure from the top shelf down and mark all lower shelf
locations on the back closet wall (Fig. 3.2).
FIG. 3.2
4.
Draw level line equal to shelf length for all lower (A) shelves onto back
closet wall (Fig. 3.1).
5.
Locate wall studs and mark location on lines.
Step 4 – Wall Hardware
Assembly
N O T E :
N O T E :
N O T E : For shelving strength and stability it is
N O T E :
N O T E :
recommended to install hooks into wall studs
(Typically 16 inches on center).
3
1.
2.
FIG. 3.0
3.
4.
FIG. 3.1
5.
6.
7.
L-Hooks are placed at each shelf end location and every wall stud in
between (Typically 16 inches on center). Use supplied plastic wall
anchors if no stud is present.
Center the top screw hole on L-Hook with level line on wall and attach
L-Hooks to wall using #8 1-1/2" screws (Fig. 4.0).
FIG. 4.0
Repeat process for all (A) Shelf locations.
Place Top (A) shelf onto L-Hooks and position Shelf End Bracket onto
front shelf end at closet side wall location (Fig. 5.0).
Level shelf (front to back - Fig. 5.1)
Mark a level line on the wall at the bottom and side of End Bracket
(Fig. 5.2).
Remove shelf and place bracket on lines drawn to mark screw hole
location. Attach bracket using
#8 1" screws (Fig. 5.3). Use supplied plastic wall anchors if no stud is
present.
FIG. 5.0
FIG. 5.1
FIG. 5.2

Advertisement

loading

This manual is also suitable for:

32039