senseFly eBee X User Manual page 58

Table of Contents

Advertisement

Using your eBee X
Step 2: Start the motor
Shake the eBee X back and forth 3 times longitudinally (within approx. 3 seconds)
to begin the motor power-up sequence.
The power-up sequence has 2 stages:
1. The motor runs at low power for a few seconds and at the same time, the
drone moves its ailerons up and down several times. This is both an auto-
matic test, and an opportunity to visually check the operation of the ailerons.
Caution: Look carefully at the ailerons as they move. Make sure they
are moving freely and are properly engaged in the servos.
58
3x
status LED:
shake 3x
motor startup begins
status LED:
green
solid
blue
pulse
shake 3x

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents