Feature; Hardware Setup - Fujitsu F2MC-8FX Setup Manual

Starter kit (ver. 5v)
Hide thumbs Also See for F2MC-8FX:
Table of Contents

Advertisement

3. Feature

The F
operation before including F
header board, continuation use also of the evaluation with a user's system can be carried out.
Below, the feature of the BGM debugger for F

4. Hardware Setup

In the hardware setup procedure, you configure and connect the hardware products. This chapter in-
cludes the configuring and connecting procedure for each product in order. Check the contents and
complete the hardware setup.
2
2
MC-8FX starter kit is the best for a performance and functional evaluation, and a check of
2
• Microcomputer operation voltage It corresponds to +2.7V to +5.5V.
(The maximum and minimum of microcomputer operation voltage and frequency of operation
differs with each MCU. refer to the documents (a data sheet, hardware manual, etc.) of each
device relation for the frequency of MCU of operation.)
• Compact development environment, a light and small BGM Adapter.
• Since a monitor program is performed in exclusive memory space, it does not consume user
memory space.
• Continuation execution, step execution, a command break, a data break, sequential break cor-
respondence
• Command trace is possible (a maximum of 16 branches).
• It connects with a host machine by the USB interface.
• Configuration of each product
- Configuring MCU Board
- Configuring Evaluation Board
• Connection of each product
- Connecting MCU Board and Evaluation Board
- Connecting BGM Adapter
- Connecting oscillators
- Connecting AC Adapter
MC-8FX in a user's system.By carrying out additional purchase of the
2
MC-8FX is shown.

Advertisement

Table of Contents
loading

This manual is also suitable for:

F2mc seriesMb2146-401-03Mb2146-09Mb2146-303Mb2146-401

Table of Contents