Setup And Mains Connection - GE eBike with Control Terminal PC Operator's Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 39
b
a
a
Figure 2-1 Removing the clamping plate
a
Fastening screws
b
Clamping lever
Figure 2-2 Mounting the handlebar
2018112-001 Revision B

Setup and Mains Connection

2
Setup and Mains Connection
Set up the ergometer where you intend to use it and adjust
the two leg levellers 12 for ergometer stability (Figure 1-
1). Protect the ergometer and, in particular, the saddle
cover from direct sunlight.
Mounting the Handlebar
Remove the two screws a from the clamping plate
(Figure 2-1).
Holding the clamping plate, turn the clamping lever b
counterclockwise until it can be removed.
Take off the clamping plate.
Insert the handlebar (pointing down) and secure it
with the clamping plate (Figure 2-2).
Introduce the two screws a and lightly screw them in.
Insert the clamping lever, turning it clockwise, and
tighten lightly.
The handlebar should point downward until the
control terminal has been installed.
Then bring the handlebar to its final position and
secure by tightening the clamping lever and the
screws.
Having tightened the clamping lever, you can bring
it to a suitable position by taking it off and
reinserting it as desired.
Furthermore, the eBike comfort allows you to
adjust the height of the handlebar (clamping lever
5, Figure 1-1).
eBike with Control Terminal PC
Note
9

Advertisement

Table of Contents
loading

Table of Contents