Amroad P3 Installation Manual

Amroad P3 Installation Manual

Door station
Hide thumbs Also See for P3:

Advertisement

AMROAD P3
DOOR STATION
~
Installation Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the P3 and is the answer not in the manual?

Questions and answers

Summary of Contents for Amroad P3

  • Page 1 AMROAD P3 DOOR STATION Installation Manual...
  • Page 3: Table Of Contents

    AMROAD P3 Contents Contents Contents..........i Package Contents ....... 1 Rear Side ........... 2 Reset Button ..........2 Installing Procedures ......3 Wire and Cable Connection ......3 Install Main Unit .......... 4 IO Application ........5 Electric Bolt ..........5 Electric Strike ..........
  • Page 4: Package Contents

    AMROAD P3 Package Contents Package Contents Pin-Torx security screws M4-L10 ×2 Front panel 8. Long Phillips screws M4-L55 ×4 Main unit 9. Relay 2-pin terminal block + cord end terminal ×2 10. L-shaped screw driver for security screws 4. 5-pin terminal block + cord end terminal ×5 11.
  • Page 5: Rear Side

    AMROAD P3 Rear Side Rear Side Reset Button 1. The device will be switched to the static IP mode and reboot itself when the user has pressed the reset button for 3 seconds. IP is "192.168.0.50". 2. When the button has been pressed for...
  • Page 6: Installing Procedures

    AMROAD P3 Installing Procedures Wire and Cable Connection Installing Procedures Wire and Cable Connection 4. For more information regarding to DI/DO Connect Power cord with 2-Pin terminal applications, please read P.5-7(IO block + cord end terminal together, and Application) for reference.
  • Page 7: Install Main Unit

    AMROAD P3 Installing Procedures Install Main Unit Place the main unit into the Mounting Box 3. Use the tool lift the doorbell button and and tighten four Phillips screws(M4-L35) . tighten 2 security screws (M4-L10) with the L-shaped key. 2. Firmly press the front panel against the device until the panel touches the wall.
  • Page 8: Io Application

    AMROAD P3 IO Application Electric Bolt IO Application Electric Bolt  DI1:The magnetic reed equipment should  The Electric Bolt is closed when +12 V is supplied. set Low (HighLow), DI1 is used to detect whether the door is closed well.
  • Page 9: Electric Strike

    AMROAD P3 產品應用 IO Application 陰極鎖 Electric Strike Electric Strike  The Electric Strike is opened when +12 V is  DI1:The magnetic reed equipment should supplied. set Low (HighLow), DI1 is used to detect whether the magnetic reed is revert.
  • Page 10: Pir Motion Sensor And Light

    IO Application PIR Motion Sensor and Light PIR Motion Sensor and Light PIR Motion Sensor and Light DO2 Service  AMROAD P3 can also connect PIR (Passive motion Infrared) sensor and Light. PIR  Device Relay Output: way to detect set motion sensor detect whether person (or High.
  • Page 12 AMROAD TECHNOLOGY INC. 17F.-1, No.16, Jian 8th Rd., Zhonghe Dist., New Taipei City 235, Taiwan (R.O.C.) 886-2-8226-5686 886-2-8226-5687 info@amroad.com.tw WWW.AMROAD.COM.TW...

Table of Contents