Commissioning; General Commissioning Process; Installing The Connector Panel Cover - BMW I Wallbox Installation Instructions Manual

Table of Contents

Advertisement

COMMISSIONING

General commissioning process

Switch on the supply voltage. 15-20 seconds after the self-test, the status LED (LED strip) must
light up blue.
Carry out the prescribed initial testing as per locally applicable guidelines and laws.
Install the casing cover, see section

Installing the connector panel cover

Note
Confirm that a current version of the software is available before you install the connector panel
cover. For further information, see section
Note
The Wallbox must not be used permanently if this cover is absent or damaged. Alternative
covers are not permitted.
26
Installing the casing
cover.
SOFTWARE
Attachment bolts
1. Replace the connector panel cover 1.
2. Attach the connector panel cover again using
the four bolts.
UPDATE.

Advertisement