Furuno FELCOM 12 Service Manual page 60

Inmarsat-c mobile earth station
Hide thumbs Also See for FELCOM 12:
Table of Contents

Advertisement

How to display the results of the PV test
1. At the default display, press [F7] to display the Disp menu.
2. Press [6].
3. Press [2] key. The results of the PV test appear on the display.
4. To escape, press any key. The default display appears.
The test result can be printed out by pressing [P] while pressing and holding down
[Ctrl].
Interpreting the PV Test Results Display
Test Date & Time:
Attempts:
BBER:
Shore-to-Ship Attempts:Number of tests initiated by LES.
Ship-to-Shore Attempts:Number of tests initiated by MES.
Distress Alert:
Signal Strength:
Overall Result:
Options
1. PV Test
2. PV Test Result
3. Self Test
4. Distress Alarm Button Test
Options
Test
PV Test Result
Test Date & Time
Attempts
BBER
Shore - to - Ship Attempts First attempt
Ship - to - Shore Attempts First attempt
Distress Alert
Signal strength
Overall Result
Pass (Applicable tests pass)
Date and time of test
Number of times the PV test was conducted.
Bulletin Board Error Rate (%). "Pass" appears for no error.
"Pass (Test OK)" appears for successful testing.
"Pass" appears if Tx signal strength is greater than +6dB
(standard).
"Pass" appears for satisfactory completion of test.
Test
Ctrl + P : print ESC : quit
97-12-12 01 : 58 (UTC)
First attempt
Pass
Pass (Test OK)
Pass (Greater than Std level + 6dB)
5-3

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FELCOM 12 and is the answer not in the manual?

Questions and answers

Table of Contents