Installing The Cable-Management Arm - IBM Hardware Management Console Installing And Configuring

Power systems
Table of Contents

Advertisement

Figure 12. Rack latches and screws
8. Completely tighten each of the four screws that were installed in the front and back of both rails.
9. If the rack will be transported, insert and tighten the two rack security screws (E).

Installing the cable-management arm

You might need to install the cable-management arm. Use the procedure in this section to perform this
task.
To install the cable-management arm, complete the following steps:
1. From the rear of the rack, locate the cable-management arm flange (A) located on the fixed rear
portion of the left system rail assembly (viewing from the back of the rack).
2. Attach the cable-management arm clasp (B) to the rail by pushing the clasp onto the rail until it locks
into place.
Installing and configuring the Hardware Management Console
33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents