IBM Hardware Management Console Installing And Configuring page 43

Power systems
Table of Contents

Advertisement

4. From the front of the rack, place the latch strike (C) over the pins. Finger-tighten the captive screw
(D) into the top pin in the front of the right slide rail (A).
Figure 6. Installing the latch strike to the front of the rails
5. Repeat the previous step to install the latch strike on the front of the left slide rail.
6. Move to the rear of the rack. Finger-tighten screw (F) to attach the cable-management arm mounting
bracket (E) to the back of the left rail (G).
Installing and configuring the Hardware Management Console
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents