Volkswagen Touareg 2003 Workshop Manual page 41

Automatic gearbox 09d
Hide thumbs Also See for Touareg 2003:
Table of Contents

Advertisement

1 - Transfer box
❑ Notes and torque set‐
tings for installing trans‐
fer box and propshaft ⇒
Transfer box and final
drive; Rep. gr. 34 ; Re‐
moving and installing
transfer box .
2 - Front and rear propshafts
3 - Rear final drive
4 - Front final drive
4.1.1
Removing
– For all engine variants, it is advisable to remove »lower engine/
gearbox connecting bolts« before removing engine and gear‐
box.
If possible, torque converter securing bolts should also be instal‐
led as early as possible.
– Remove engine with gearbox ⇒ engine; Rep. gr. 10 ; Re‐
moving and installing engine .
Vehicles with V10 TDI engine
– Remove starter cable far enough that the connecting bolt can
be removed ⇒ Electrical system; Rep. gr. 27 ; Starter; Re‐
moving and installing starter .
Automatic gearbox 09D Volkswagen R GmbH - Edition 06.2010
Touareg 2003 ➤
4. Removing and installing gearbox
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents