Yamaha F70AET Rigging Manual page 12

Table of Contents

Advertisement

UNCRATING PROCEDURE
(FOR TYPICAL STEEL FRAME)
7. Remove the top cowling (6).
(6)
8. If the lifting points are covered by the fly-
wheel cover, remove it.
9. Attach a lifting harness (7) securely to the
lifting points (8), and tighten the harness.
(7)
(7)
For 4-stroke V8, V6 (4.2L) and L4 (2.8L,
1.8L) engines, install the lifting attachment
(A) to the flywheel using the exclusive 3
bolts (B), insert the eye bolt (C) to the
attachment, attach a lifting harness (D) to
the eye bolt, and tension the harness.
(D)
(D)
* Special service tool for 4-stroke V8, V6 (4.2L)
(8)
(8)
1-4
M10 bolt (B) torque:
36 Nm, 3.6 kgf•m, 27 ft•lb
(B)
(B)
(C)
(C)
and L4 (2.8L) engines: Lifting eye kit (P/N:
90890-06820)
Lifting eye kit contents:
Eye bolt (C)
Eye bolt (C)
Eye bolt (C)
Attachment (A)
Attachment (A)
Attachment (A)
M10 bolt (B)
M10 bolt (B)
M10 bolt (B)
90890-06821 (3 pcs)
90890-06821 (3 pcs)
90890-06821 (3 pcs)
(A)
(A)
To be continued.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents