Sequence Of Operation - Lennox KGA Series Service Literature

Units 7.5 to 12.5 ton, 26.3 to 42 kw
Table of Contents

Advertisement

POWER:
1- Terminal strip TB1 energizes the economizer components with 24VAC.
OPERATION:
2- Enthalpy sensor A7 and A62 (if differential enthalpy is used) communicates to the economizer control
module A6 when to power the damper motor B7.
3- Economizer control module A6 supplies B7 with 0 - 10 VDC to control the positioning of economizer.
4- The damper actuator provides 2 to 10 VDC position feedback.
ECONOMIZER

SEQUENCE OF OPERATION

Page 44

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents