Power:
1- Line voltage from unit disconnect energizes trans
former T1. T1 provides 24VAC power to terminal strip
TB1. TB1 provides 24VAC to the unit cooling, heating
and blower controls.
Blower Operation:
2- Indoor thermostat terminal G energizes blower contac
tor K3 with 24VAC. N.O. K3 closes, energizing blower
B3.
Economizer Operation:
3- The economizer control module receives a demand
and energizes exhaust fan relay K65 with 24VAC at
50% outside air damper open (adjustable).
4- N.O. K65-1 and N.O. K65-2 both close, energizing ex
haust fan motor B10.
1st Stage Cooling (compressor B1)
5- First stage cooling demand Y1 and G are energized by
KGA092/150 Sequence of Operation
Page 40
the thermostat. G energizes blower. 24VAC is routed
through TB1 passing N.C. freezestat S49 and optional
N.C. high pressure switch S4. Compressor contactor
K1 is energized. N.O. contacts K1 close energizing
compressor B1.
6- Optional N.O. low ambient switch S11 closes to ener
gize condenser fan relay K10. N.O. contacts K10-1 and
K10-2 close energizing condenser fans B4 and B5.
N.C. contacts K10-1 open de-energizing crankcase
heaters HR1 and HR2.
2nd Stage Cooling (compressor B2 is energized)
7- 24VAC is routed through TB1 and proves N.C. freezes
tat S50 and optional N.C. high pressure switch S7.
Compressor contactor K2 is energized. N.O. K2 con
tacts close energizing compressor B2.
8- Optional N.O. low ambient switch S84 closes to ener
gizing condenser fan relay K10. N.O. contacts K10-1
and K10-2 close energizing condenser fans B4 and B5.
N.C. contacts K10-1 open de-energizing crankcase
heaters HR1 and HR2.