Installation Instructions

5.1

Pre-check

Installation should be performed by the skilled technician to guarantee the normal operation
and prevent malfunctions and please read this manual carefully prior to installation.
The chiller is manufactured, inspected and tested strictly in accordance with the quality
control program and it will work properly within the expected service life as long as its
installation, operation and service.
5.2

Acceptance Check

The user is responsible for organizing personnel to perform the acceptance check at the
regulated plate of delivery. Checks listed below should be taken as a minimum.
(1)If all required documents and accessories are provided as per the packing list.
(2)Check the equipment model.
(3)If the equipment is damaged and all parts are provided.
(4)If refrigerant leaks.
(5)Do not remove the protective cover on the flagon of the shell-and-tube heat exchanger
before connecting the water tube and check if the water pipe is clean.
(6)Check if the installation and operation are within the allowable conditions.
10