Mmc Software Update; Replacing The Battery - Viessmann Vitoflex RF 150 Installation And Service Instructions Manual

Wood-fired boiler, output range: 154/205/273/341/478-512/751/1024/1365/1843 mbh, 45/60/80/100/140-150/220/300/400/540 kw
Table of Contents

Advertisement

Operation
ECOTRONIC Control System

MMC software update

The MMC software update is required if there is a change
in the software, e.g. adding a control feature.
To perform the update, go by the following steps:
■ Disconnect the power supply to the operating module.
■ Remove the housing cover from the bottom of the
Ecotronic module.
■ Connect the MMC dongle to the port for the MMC-
dongle.
■ Keep the
key pressed, connect the power supply to
^
the Ecotronic module.
■ After approx. 5 seconds the following text will be
displayed: .............................................................
^
■ Release the
key.
■ Briefly press the data transfer key to transfer the
software.
■ After the software update is done, the following
message will be displayed: ......................................
Finished, restart
■ Disconnect the power supply.
■ Keep the O key pressed, connect the power supply
to the Ecotronic module.
■ After approx. 5 seconds the following text will be
displayed:..............................................................
■ Release the O key, press the F1 key to load the basic
settings.
■ Disconnect the power supply, wait for approx. 5 seconds.
■ Connect the power supply.
■ Disconnect the MMC-dongle approximately 5 seconds
after the control has booted up. (Please return the MMC
dongle as quickly as possible to Viessmann).
Data transfer
button
Port for CAN-BUS
Note: Once the update has been successfully loaded, the MMC-dongle will no longer be required by the Econtronic module.
54
(continued)

Replacing the battery

There is a battery built in beneath the removable lid on
the control module (type: Panasonic Lithium BR2330).
It is for buffering the time, date and settings.
- The battery needs replacing every five years!
- Do not dissconnect the main power voltage while
changing the battery (do not trun off main switch)!
See the location of the battery on page 55.
Test clearance
Press clearance
Load program
Ser: 000000000
MMC read #####
MMC evaluate: -M-
Prg test: 100% OK
Prg load: !00% OK
New boot block
FlashMonll V2.0da
F1..load basic setting
F3//Valves runtime OFF
Measuring transducer normal
Port for the MMC-dongle
Vitoflex 300-RF Installation & Operating
Buffer battery

Advertisement

Table of Contents
loading

Table of Contents