Flue Gas Cyclone - Viessmann Vitoflex RF 150 Installation And Service Instructions Manual

Wood-fired boiler, output range: 154/205/273/341/478-512/751/1024/1365/1843 mbh, 45/60/80/100/140-150/220/300/400/540 kw
Table of Contents

Advertisement

Vitoflex 300-RF Installation & Operating

Flue Gas Cyclone

The flue gas cyclone minimizes dust emissions and is
designed as a multi cyclone with axial function. The
de-duster is fully insulated and has three covers for
cleaning. The flue gas cyclone for 300 RF is an option,
and is not generally required when burning pellets but is
recommended when burning chips.
The crude gas chamber is cleaned via the side cleaning
cover. The clean gas chamber is cleaned via the upper or
back cleaning cover (unused blower connection).
The ash box has a carriage and is connected to the de-
duster with quick-action fasteners. It can easily be pulled
out for emptying. The blower can be installed either
on the side or the top.
Boiler Model
a
in. (mm)
b
in. (mm)
c
in. (mm)
d
in. (mm)
e
in. (mm)
f
in. (mm)
g
in. (mm)
h
in. (mm)
l
in. (mm)
m
in. (mm)
n
in. (mm)
p
in. (mm)
r
in. (mm)
RF 150
59
(1521)
7 / 8
90 (2285)
59c (1518)
33
(846)
5 / 16
35
(899)
7 / 16
21a (540)
16
(430)
15 / 16
21
(545)
7 / 16
64
(1640)
56
9 / 16
16
(414)
5 / 16
11 (280)
7
(200)
7 / 8
30
(780)
11 / 16
Supplied with:
1 flue gas cyclone
1 ash container 24 USG (90 L)
CAUTION
The effects of heat can create dangerous conditions.
RF 220/300
64d (1628)
100b (2552)
69
(1775)
73
7 / 8
33
(846)
5 / 16
45b (1156)
21
(550)
5 / 8
16
(424)
11 / 16
20
(530)
7 / 8
(1440)
11 / 16
16
(414)
5 / 16
14
(370)
9 / 16
9
(250)
7 / 8
30
(780)
11 / 16
Legend
A Flue gas exhaust blower (with variable
rotation)
- Either top or side
- Unused connection as cleaning cover,
clean gas space
- alternate mounting of flue gas exhaust
blower (shown in dark grey)
B Cleaning cover (crude gas chamber)
C De-duster (axial cyclone)
D Ash bin support frame 24 USG (90 L)
E Recirculation gas to boiler
F Flue gas to chimney
Ash bin support frame positioning is
possible in 4 x 90
(extraction, ash bin)
°
RF 400
65c (1671)
109
106e (2702)
(1875)
13 / 16
33
(846)
5 / 16
49
(1256)
7 / 16
23f (600)
17f (447)
38b (977)
70b (1790)
18
(480)
7 / 8
14
(370)
9 / 16
11
(300)
13 / 16
49f (1260)
Mechanical
RF 540
68
(1741)
9 / 16
(2776)
5 / 16
76c (1949)
36a (920)
49
(1256)
7 / 16
23f (600)
17f (447)
38b (977)
70b (1790)
18
(480)
7 / 8
14
(370)
9 / 16
11
(300)
13 / 16
49f (1260)
27

Advertisement

Table of Contents
loading

Table of Contents