High Capacity Ratchet Knockout Drivers - Greenlee 1904Pg Instruction Manual

High capacity ratchet knockout drivers
Table of Contents

Advertisement

Draw Stud Threads
Punch
7. Thread the punch onto the stud so that the cutting
surfaces of the punch are toward the material.
Note: This end of the stud and the punch have right-
hand threads.
Note: Do not unthread the stud.
Line up using
crosshairs on die
8. Push the ratchet direction lever to the left.
9. Turn the ratcheting handle counterclockwise.
Continue to ratchet until the punch is completely
through the material.
Do not drive the ratchet after spindle motion stops.
Driving the ratchet after the spindle motion stops can
damage the punch driver. If the spindle is at the end
of its stroke and the punch is not completely through,
unthread the punch and check the setup. The
spindle must be in the starting position and the stud
must be threaded completely into the spindle.
Greenlee Textron / Subsidiary of Textron Inc.

High Capacity Ratchet Knockout Drivers

Input Hub
Ratchet Lever
Punch
Direction
10. Remove the driver assembly from the punched hole.
11. For rapid return, hold the assembly as shown.
Rotate the handle as shown until the spindle is fully
extended.
12. Remove the punch, die, and draw stud.
6
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815/397-7070

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

19041906sb1904pgsb

Table of Contents