Setup And Operation - Greenlee 1904Pg Instruction Manual

High capacity ratchet knockout drivers
Table of Contents

Advertisement

Setup and Operation

Set the ratchet driver to the starting position, as follows.
1. Move the ratchet direction lever to the right.
Yellow will
show in
view hole
2. Rotate the ratchet as shown. When the spindle is
fully extended, the view hole will be completely filled
with the yellow band.
3. Select the appropriate punch and die. Use the Draw
Stud Selection Table to determine the corresponding
draw stud. Install the draw stud as shown.
Note: All draw studs for the 1904 have left-hand
threads.
Greenlee Textron / Subsidiary of Textron Inc.
High Capacity Ratchet Knockout Drivers
Ratchet Lever
Spindle will be
close to end
4. Snug up the draw stud with a wrench.
5. Install the die onto the stud so that the opening of
the die faces outward.
Draw
Stud
Die
6. Insert the draw stud through the pilot hole.
5
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815/397-7070
Die

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

19041906sb1904pgsb

Table of Contents