Installation And Connection; Completeness Check Of The Product; Electrical Connection - BAS-IP AA-09 Series Manual

Table of Contents

Advertisement

Installation and connection

This page describes the process of installation and connection of the outdoor panel.

Completeness check of the product

Electrical connection

Mechanical mounting
Connection of additional modules
Completeness check of the product
Before installation of the outdoor panel, it is necessary to check that it is complete and all
components are available.
Outdoor panel kit includes:
Outdoor panel
Flush mount bracket
Installation instructions
Set of wires with connectors for connection of power supply, lock,
and additional modules.
A set of plugs for connections
Wrench set screws
Electrical connection
After verifying whether a device is complete, you can switch to the connection step.
For connection you will need:
• An Ethernet UTP CAT5 or higher cable connected to a network switch/router. 
Cable lenght recomendations
The maximum length of the UTP CAT5 cable segment should not exceed 100 meters,
according to the IEEE 802.3 standard.
• Power supply at + 12V, 2 amps. 
• Wires must be brought for connecting the lock and additional modules (optional). 
You can connect any type of electromechanical or electromagnetic lock for which the
switched current does not exceed 5 Amps.
The following are typical connection schemes of all elements to the outdoor panel:
(see page 43)
(see page 43)
(see page 47)
(see page 48)
1 pcs
1 pcs
1 pcs
1 pcs
1 pcs
1 pcs
Installation and connection –  43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aa-09e goldAa-09m goldAa-09b gold

Table of Contents